From the ASCE 7 Hazard Tool or Figure 7.2-1 for your site.
Ce per Table 7.3-1 — roughness row × exposure column. Above tree line and treeless Alaska have no sheltered column.
Roof
Ct interpolated from the Table 7.3-3 grid on R and pg; R > 50 takes Ct = 1.2 (footnote b). R-30 is a common insulated roof.
The §7.3.4 minimum for low-slope roofs — kept as a SEPARATE load case pm below: a separate uniform case, not additive with drift or unbalanced loads.
Unbalanced (gable) — optional
Both values > 0 run the 7-22 §7.6.1 method (W₂ from Fig. 7.6-1 / the Hazard Tool). Left at 0, the engine falls back to the pre-7-22 simplified 2pf/Ce and says so.
Results
Roof section
Factors each cites its table
Unbalanced snow ASCE 7-22 §7.6.1
How this is calculated
Formula chain with code citations
Run a calculation to see the chain.
pf = 0.7·Ce·Ct·Is·pg (Eq. 7.3-1) · ps = Cs·pf (§7.4) · pm per §7.3.4. The drift surcharge at parapets and adjacent roofs (§7.7) is a desktop feature — this page flags it, the desktop app computes it.